The immediate feedback has been phenomenal across the board. Not only has it had the intended effect of providing a common operating picture, but it has had immediate effects increasing communication, accountability, and motivation.

Bryan Wenzel (UMCS Program Manager, Parsons Corporation)

The immediate feedback has been phenomenal across the board. Not only has it had the intended effect of providing a common operating picture, but it has had immediate effects increasing communication, accountability, and motivation.

Bryan Wenzel (UMCS Program Manager, Parsons Corporation)

Case study: Parsons Corporation

Engineering giant saves 2-3 weeks and  $5,000-$7,000 per project by digitalizing their utility survey processes with Appenate.

Appenate case study overview for Parsons — founded 1944; industry: engineering and construction; application: UCMS utility surveys.

Case study: Parsons Corporation

Engineering giant saves 2-3 weeks and  $5,000-$7,000 per project by digitalizing their utility survey processes with Appenate.

Appenate case study overview for Parsons — founded 1944; industry: engineering and construction; application: UCMS utility surveys.

Business Goal

Eliminate recurring errors in utility monitoring system surveys for U.S. Army Corps of Engineers sites while streamlining manual transcription and client deliverable creation.

Obstacles

Traditional pen and paper surveys resulted in siloed teams, frequent errors, time-consuming data entry, and a lack of real-time coordination across functional areas.

Outcomes

Achieved substantial error reduction, produced client deliverables in a fraction of the time, and created a unified platform providing a common operating picture across all teams.

Their Challenge

Parsons Corporation’s Utility Monitoring and Control Systems (UMCS) program faced recurring problems when surveying U.S. Army Corps of Engineers sites for utility monitoring system installations.

Their manual process created cascading problems:

The program director recognized errors throughout the workflow. Without automatic data links between phases, teams couldn’t catch errors or coordinate effectively.

The Appenate Solution

Using Appenate, they created a series of mobile, automated forms for each project phase — from initial surveys through design, build, and installation.

The solution delivered immediate improvements:

“Working with the digital form team, we were able to integrate all of those lists onto a common platform,” said Bryan. “The immediate feedback has been phenomenal across the board.”

From manual transcription nightmares to seamless digital workflows, Parsons Corporation’s transformation demonstrates how innovative application of existing technology can revolutionize field operations.

Appenate case study results for Parsons Corporation: maximized efficiency, reduced costs, increased productivity, and enhanced coordination.

Switching platforms is never a small decision. But for Parsons Corporation, the results made it pretty clear they’d made the right call.

Maximized efficiency

Digital validation features ensure accurate data entry, reducing careless mistakes and increasing confidence in QA results.

Reduced costs

Bryan estimates savings of 2-3 weeks or $5,000-$7,000 per project through automated report generation and error reduction.

Increased productivity

Dynamic logging of utility assessments through intuitive forms eliminated manual transcription errors and time delays.

Enhanced coordination

The unified platform increased communication and accountability while providing real-time visibility into project status.

Want to see how Appenate can help your business?

Want to see how Appenate can help your business?